Boundary Wall, Brikama Tank Site
Construction of a boundary wall and rehabilitation works at the Brikama tank site.
A boundary wall built around the Brikama tank site, with associated rehabilitation works to the compound.
Water assets need a secure perimeter as much as they need pumps. The wall defines and protects the site, and the rehabilitation works brought the rest of the compound back to a serviceable standard.