OIC Water Project, Sanyang
Raw water and clear water transmission plus a full distribution system at Sanyang.
Construction of raw water transmission, clear water transmission and the water distribution system serving Sanyang, delivered as part of the OIC water programme.
Raw water is moved from source to treatment, clear water from treatment into the network, and the distribution mains carry it to the connections. Each stage carries different pressures and different pipe specifications, and all three were built and commissioned under this contract.