HydrotechEngineering and Trading Enterprise Call +220 83 357 4143
Aquaculture infrastructure

Rehabilitation of 10 Fish Ponds, Jahally

Rehabilitation of 10 fish ponds in Jahally: clearing vegetation, desilting, clearing the canal and making all 10 ponds operational again.

Rehabilitation of 10 Fish Ponds, Jahally, Jahally, Central River Region, delivered by Hydrotech Engineering

Ten fish ponds at Jahally in the Central River Region were rehabilitated: vegetation cleared, silt removed, the canal cleared, and all ten ponds returned to operation.

Aquaculture infrastructure fails quietly. A pond that cannot hold or release water on demand stops being a productive asset long before it looks broken, so the work focused on the control structures as much as on the earthworks.

Have a project to price?

Tell us the scope and the location. You will get a straight answer about whether we are the right contractor for it.

WhatsApp us